|
|
|
Piping and Schematic to Design (PIE) Module
/Piping Design 2 (PIP).gif) |
Piping Design 2 (PIP)
Provide 3D tools to create, modify, analyze, and document piping designs based (optionally) on specifications in 2D Piping and Instrument Diagrams. |
/Piping and Instrumentation Diagrams 2 (PID).gif) |
Piping and Instrumentation Diagrams 2 (PID)
Provide a complete set of tools to create, modify, analyze and document the logical design of piping networks, equipment and their associated instrument loops. |
/Systems Diagram 2 (SDI).gif) |
Systems Diagram 2 (SDI)
Provide a common platform for CATIA diagram applications (Piping & Instrumentation, Tubing, Waveguide, HVAC and Electrical Cabling). |
| | |
 |
|
|
|
|
 |
|
|
|
All aspects of the project have been executed with extraordinary experience and delivered excellent results. After completing a 3 month project, the results of this work and the overall costs mean that Intrinsys is now recommended as an excellent partner for this kind of project. | |
 | |
|
|
 |
|
|
|
Intrinsys have been a major partner and supported us with the implementation, training and software customisation to suit our business needs | |
 | |
|
|
 |
|
|
|
Just 36 years old, Thomas Heatherwick has already established himself as one of the most exciting and innovative figures in British design. He is perhaps most famous for his sculpture, The B Of The Bang, in Manchester. Heatherwick Studios is pushing the boundaries of archechture, sculpture and product design by combining all three with innovative free thinking and not letting existing construction techniques curb ambition. |
|
 | | |
|