Sunday 05/02/2012



And the Winner Is…CATIA
26 January 2012
When the six finalists for the 2012 North American Car/Truc...
Lawrence Tech Students Develop Winning Designs Using Dassault Systemes
12 January 2012
Dassault Systemes, a world leader in 3D and Product Lifecyc...
Dassault Systèmes Acquires Enginuity PLM to Accelerate Innovation for Formulated Products
20 December 2011
Dassault Systèmes Expands PLM Offer for CPG, Life Sciences ...
Isight 5.6 for Simulation Automation and Design Optimization
20 December 2011
Dassault Systèmes has announced the availability of Isight ...
CATIA Natural Sketch gives digital sketching a whole new dimension
06 December 2011
A breakthrough 3D sketching experience, that finally brings...


Architectural Engineering & Construction

PLM "Push or Pull"

The benefits available from the deployment of PLM are significant, especially to those businesses offering the wider spread of services within their contract. PLM is starting to be used as a way of differentiating a business from its competitors by showing a more advanced and forward looking approach which will deliver to clients, a superior project. As the industry starts to recognize the benefits and the potential that can be achieved through the deployment of PLM, then building owners will start to demand the use of a PLM driven digital approach and request this as part of the deliverables.

 

 

 

> Project Lifecycle Management (PLM)

> Building Information Management (BIMan)

> PLM Benefits

> Business Pressures

> Can AEC benefit from lessons learnt in Auto and Aero?



Just 36 years old, Thomas Heatherwick has already established himself as one of the most exciting and innovative figures in British design. He is perhaps most famous for his sculpture, The B Of The Bang, in Manchester. Heatherwick Studio is pushing the boundaries of architecture, sculpture and product design by combining all three with innovative free thinking and not letting existing construction techniques curb ambition.


 

 


Intrinsys | Denbigh Road Bletchley Milton Keynes MK1 1DB
|Tel: +44 (0) 1908 278606 | Fax: +44 (0) 1908 278601 | Email: info@intrinsys.co.uk
© Copyright Intrinsys 1998 - 2011 | Privacy Policy | Terms & Conditions