|
|
|
Oil & Gas
Market Challanges
Trading
- Respond to production requirement
- Optimise supply costs
- Maximise product sales
- Improve availability and response to different situations
Marketing
- Define market demand
- Improve performance and responsiveness
- Insure control of customer targets
- Improve safety performance
Production
- Improve production (reduce cost and delays)
- Improve performance (response and quality)
- Manage resources and optimise asset utilisation
- Anticipate and react to production disturbance
- Anticipate, simulate and measure operating actions
- Optimize maintenance work and avoid incidents
- Anticipate and control safety conditions
Supply & Distribution
- Optimise supply and distribution costs
- Insure on time delivery (quantity and quality)
- Manage and avoid safety and environmental incidents
- Optimise asset utilisation (transport and inventory)
- Anticipate, simulate and measure operating actions
- Automation
> V5 PLM Solutions
> V5 PLM Benefits
> Roadmap
> Product Life-cycle Management (PLM)
> PLM on the 3 main levels of engagement
| | |
 |
|
|
|
|
 |
|
|
|
All aspects of the project have been executed with extraordinary experience and delivered excellent results. After completing a 3 month project, the results of this work and the overall costs mean that Intrinsys is now recommended as an excellent partner for this kind of project. | |
 | |
|
|
 |
|
|
|
Intrinsys have been a major partner and supported us with the implementation, training and software customisation to suit our business needs | |
 | |
|
|
 |
|
|
|
Just 36 years old, Thomas Heatherwick has already established himself as one of the most exciting and innovative figures in British design. He is perhaps most famous for his sculpture, The B Of The Bang, in Manchester. Heatherwick Studios is pushing the boundaries of archechture, sculpture and product design by combining all three with innovative free thinking and not letting existing construction techniques curb ambition. |
|
 | | |
|